Building Permit Authority

Acme Building Permit Office

Palliser Regional Municipal Services - Safety Codes

Active Last verified: 2026-09-27 Alberta
Municipality
Acme
Jurisdiction
Village of Acme
Address
203 Clarke Street, Acme, Alberta, T0M 0A0
Google Maps Permit office location

Development approval and Safety Codes permits in Acme, Alberta are handled through two separate authorities. The Village of Acme administers local development permits and land-use review, while Palliser Regional Municipal Services (PRMS) processes building, electrical, gas, plumbing and private sewage permits for the municipality.

A municipal development permit does not replace a building or other Safety Codes permit. Projects requiring both approvals must complete the Village land-use process and the applicable PRMS permit process before construction proceeds.

Local Permit Structure

The Village remains responsible for development permits in Acme. PRMS provides the regional Safety Codes permit service. PRMS does not act as Acme’s municipal Development Authority, so development approval and building-code approval should be treated as separate parts of the project.

Permit Process

How Permitting Works in Acme

  1. 1

    Check the Development Permit Requirement

    Start with the Village of Acme’s Land Use Bylaw and development process. Some activities are exempt from a development permit, but an exemption from municipal development approval does not automatically remove Safety Codes permit requirements.

  2. 2

    Submit the Village Application

    Where development approval is required, the application is submitted to the Village with the required supporting information and application fee. The Village’s application form states that review does not begin until the applicable fee has been paid.

  3. 3

    Apply for Safety Codes Permits

    Building permits and any required electrical, gas, plumbing or private sewage permits are processed separately through PRMS. Separate permit applications are used for the individual Safety Codes disciplines.

  4. 4

    Complete Required Inspections

    Inspection stages are identified through the Safety Codes review. The PRMS building permit form directs permit holders to call for inspections according to the plans review rather than waiting until the project is complete.

Application Package

Development Permit Submission Requirements

The Village’s current development permit package identifies specific information required for a complete application.

  • Completed Village of Acme Development Permit Application
  • Applicable development permit application fee
  • Certificate of Title or other legal documents showing ownership
  • Detailed site plan drawn to scale
  • Existing and proposed utility-service information
  • Information addressing the presence of abandoned oil and gas wells

The site plan is expected to identify items such as property dimensions, required yards, easements and rights-of-way, existing and proposed structures, distances to property lines, parking and access points, and relevant physical features. The Development Authority may request additional material for individual applications, including drawings, a Real Property Report, grading or stormwater plans, or other technical documentation.

Authority Split

Development Approval vs. Safety Codes Permits

Village of Acme

Planning and Development

The Village reviews the proposed use, site layout and compliance with the local Land Use Bylaw. Development permits, variances and other municipal land-use matters remain part of this local process.

PRMS

Safety Codes Permits

Palliser Regional Municipal Services processes building, electrical, gas, plumbing and private sewage permit applications within its regional program. These approvals address the applicable Alberta Safety Codes requirements rather than local zoning approval.

Inspections

Current Safety Codes Inspection Service

PRMS continues to administer Safety Codes permits, while field inspection services in the Palliser region are currently delivered by The Inspections Group Inc. PRMS announced that this inspection arrangement took effect on March 17, 2026.

Permit and Inspection Roles Are Different

PRMS remains the regional permit-administration contact even though a contracted inspection agency performs the Safety Codes inspections. Inspection stages should follow the requirements supplied with the permit and plans review.

Residential Projects

Check HIRF Requirements Before Design

The Village specifically directs residential owners and designers to review High Intensity Residential Fire requirements before starting building design. HIRF provisions can affect spatial separation and construction where applicable, so this review is best completed before finalizing building location, wall openings and exterior construction details.

Official Links

Official Permit Resources

Scroll to Top