Building Permit Authority

Abbotsford Building Permit Office

Building Permits Division

Active Last verified: 2026-09-27 British Columbia
Municipality
Abbotsford
Jurisdiction
City of Abbotsford
Address
32315 South Fraser Way, Abbotsford, British Columbia, V2T 1W7
Google Maps Permit office location

Building permits in Abbotsford, British Columbia are administered by the City of Abbotsford through the Building Permits & Licences Division within Planning and Development Services. The City accepts building, plumbing and sprinkler permit applications through its online permit portal.

Building review is coordinated with Abbotsford’s zoning and development requirements. Projects that need rezoning, a development permit, subdivision approval or another land-use approval may therefore have a separate Planning process before the building permit can proceed to issuance.

Permit Process

How Abbotsford Building Permits Work

  1. 1

    Check the Property and Planning Requirements

    Confirm the property’s current zoning, applicable development permit area and any required land-use approvals. Abbotsford’s property information tools and WebMap provide zoning and development information for individual parcels.

  2. 2

    Prepare the Project-Specific Submission

    Use the City’s application guide and submission checklist for the applicable permit type. Requirements differ for residential work, complex buildings, tenant improvements, agricultural projects, pools, retaining walls and other permit categories.

  3. 3

    Apply Through the Online Permit Portal

    Building, plumbing and sprinkler permit applications can be submitted through the City’s online service portal. A login is required for these permit application services.

  4. 4

    Complete Review and Obtain the Permit

    City staff review the submission against the applicable building requirements, zoning regulations and other municipal requirements. Construction requiring a permit must not begin until the permit has been issued.

  5. 5

    Book Required Inspections Online

    Inspections are requested as construction reaches the stages identified for the permit. Abbotsford requires inspection bookings to be made through its online inspection system.

Planning & Building

Land-Use Approval May Be a Separate Step

Planning

Zoning and Development Approval

Development Planning handles matters such as rezoning, subdivision and development permits. Abbotsford’s Official Community Plan also establishes development permit areas and guidelines for certain properties and project types.

Building

Construction Permit Review

The Building Permits & Licences Division reviews construction permit applications. A planning approval does not replace the building permit required for construction, and a project may need approvals from both functions.

Current Zoning Check

Abbotsford updated its Zoning Bylaw through the Abbotsforward 2050 process, including residential zoning changes. Current parcel information should be checked before preparing permit drawings rather than relying on older zoning information.

Inspections

Inspection Requests Are Online Only

The permit holder is responsible for requesting required building and plumbing inspections and ensuring work remains available for inspection before it is covered. Abbotsford states that inspection bookings are not accepted by phone, voicemail or email.

  • Booking method:
    Use the City’s online inspection scheduling service.
  • Permit information:
    The online scheduler requires the 8-digit building permit number together with the inspection type and contact information.
  • Advance notice:
    The City requires at least 24 hours’ notice for an inspection to be scheduled.
  • Results:
    Inspection results are emailed to the permit holder and can also be viewed online.
Local Permit Note: Properties Without City Sewer

On-site sewage systems are not permitted through Abbotsford’s Building Permits & Licences Division. Fraser Health administers the health-authority filing process for on-site sewerage systems. Abbotsford’s Building Bylaw states that a building permit for a property not served by a public sanitary sewer system cannot be issued until the City has written confirmation from an Authorized Person that the required Health Authority filings have been completed.

Applications

Use the Checklist for the Exact Permit Type

Abbotsford publishes different application guides and submission checklists instead of using one universal building permit package. The required drawings and supporting documents therefore depend on the proposed work.

  • Select the correct City permit category before preparing the submission.
  • Use the current application guide and submission checklist for that project type.
  • Confirm zoning and other applicable land-use requirements for the property.
  • Submit the permit application and required supporting documents through the City’s online permit system.
  • Keep approved drawings and required inspection documentation available during construction.
Fees

Building Permit Fees Are Set by Schedule G

Building permit charges are established under Schedule G of Abbotsford’s consolidated Fees and Charges Bylaw. The schedule includes application fees and construction-value-based permit charges, while additional charges or securities may apply to particular developments. The consolidated bylaw includes amendments adopted in 2026, so the current Schedule G should be used when checking permit costs.

Official Links

Official Abbotsford Permit Resources

Scroll to Top