Building Permit Authority

Ashcroft Building Permit Office

Building Inspection / Village Office

Active Last verified: 2026-09-27 British Columbia
Municipality
Ashcroft
Jurisdiction
Village of Ashcroft
Address
601 Bancroft Street, Ashcroft, British Columbia, V0K 1A0
Google Maps Permit office location

Building permits and inspections in the Village of Ashcroft are administered by Thompson-Nicola Regional District (TNRD) Building Inspection Services under a municipal service arrangement. TNRD performs building-code plan review and construction inspections, while Ashcroft’s municipal zoning, servicing and land-development requirements remain part of the approval process.

This shared structure means a building permit file may be processed by TNRD while a related development permit, variance, zoning amendment or municipal servicing approval is handled through the Village or coordinated with its planning process.

Local Permit Note

Ashcroft does not operate a separate day-to-day building inspection department for permit processing. TNRD provides the contracted building permitting and inspection service. Permit fees for contracted municipalities such as Ashcroft are established under the applicable municipal building bylaw rather than automatically using the TNRD fee schedule for Electoral Areas.

Permit Process

How Building Permits Are Processed in Ashcroft

  1. 1

    Confirm land-use requirements

    Check the proposed use, setbacks and other municipal requirements before completing construction plans. Projects requiring a development permit, variance, zoning amendment or other land-use approval may need that process addressed separately.

  2. 2

    Prepare the permit package

    Complete the applicable TNRD building and plumbing permit materials and provide the plans and supporting documents required for the type of construction.

  3. 3

    Complete building and municipal review

    TNRD reviews the construction documents for Building Code and building-bylaw requirements. Municipal projects are also reviewed for Ashcroft requirements such as zoning and applicable water, sewer, storm or development conditions.

  4. 4

    Obtain the permit and schedule inspections

    Once outstanding requirements are satisfied and the permit is issued, construction proceeds through the inspection stages identified for the permit. Final approval is required before occupancy where an occupancy certificate is required.

Application

Dwelling Permit Package

The dwelling application materials published for Ashcroft identify a defined submission package rather than a generic construction checklist.

  • Building and Plumbing Permit Application
  • Two sets of construction plans, including site, foundation, floor, elevation and cross-section drawings
  • Energy documentation required for the proposed dwelling work
  • Truss and floor-beam information showing concentrated loads where applicable
  • Homeowner Protection Act registration and professional documents where applicable
  • Municipal utility approval or onsite sewage-disposal approval, depending on how the property is serviced
Local Approvals

Building Review and Land Development Are Connected

Planning

Zoning and Development Approvals

Building review does not replace municipal land-use approval. Ashcroft publishes separate application forms for development permits, zoning amendments, Official Community Plan amendments, variances and temporary use permits. Where one of these approvals applies, it should be resolved as part of the development sequence rather than treated as a building-code issue.

Sewer / Septic

Serviced and Unserviced Properties

Ashcroft’s Building Regulations Bylaw distinguishes properties connected to the Village system from sites where sanitary sewer is unavailable. For an unserviced property, a building permit cannot be issued until written verification is provided that the proposed sewage-disposal system is accepted by Interior Health. For a Village connection, Public Works authorization may be required.

Inspections

Booking Required Building Inspections

TNRD Building Inspection Services carries out the required construction inspections for Ashcroft permits. TNRD maintains an online inspection-request system, and the permit documentation identifies the stages that must be inspected before work is covered or construction advances.

  • Advance notice:
    The published dwelling permit material requires inspection requests no later than 12:00 noon on the business day before the requested inspection day.
  • Permit identification:
    The building permit number must be provided when requesting an inspection.
  • Inspection stages:
    Required stages may include siting and formwork, plumbing, pre-backfill, framing, insulation and final inspection, depending on the project.
  • Occupancy:
    Ashcroft’s building bylaw requires the applicable occupancy certificate before a completed building or affected portion is occupied or used.