Belcarra Building Permit Office
Belcarra
Village of Belcarra
604-937-4100
belcarra@belcarra.ca
Monday-Friday, 8:00 AM-4:00 PM
4084 Bedwell Bay Road, Belcarra, British Columbia, V3H 4P8
Building permits in Belcarra are administered locally by the Village of Belcarra Building Department. Before a building permit application is submitted, the Village’s Building and Plumbing Code Regulation Bylaw requires applicable development permits, zoning compliance, ownership documentation and other required approvals to be addressed.
The process is particularly site-sensitive in Belcarra. On-site sewage, shoreline work, watercourses, driveway access and potable-water requirements can add approvals or supporting documents to a building permit file.
How the Belcarra Building Permit Process Works
-
1
Resolve planning requirements
Confirm that the proposed work complies with Village zoning. Where a development permit, development variance, rezoning or other land-use approval is required, that approval must be resolved before the related building permit can be issued.
-
2
Prepare the Village application package
Complete the building permit application and assemble the drawings, site plans, current title information and project-specific supporting documents identified by the Village.
-
3
Obtain applicable outside approvals
Projects involving on-site sewage, shoreline areas, watercourses or other regulated site conditions may require documentation from another authority or qualified professional before the building file is complete.
-
4
Submit for building review
The completed package is reviewed through the Village Building Department. Construction must not begin until the required building permit has been issued.
-
5
Request required inspections
Inspection stages must be coordinated with the Village during construction, and work subject to inspection must remain visible until the applicable acceptance requirements have been satisfied.
Documents Identified in the Current Permit Package
- Three copies of design drawings, including structural drawings where applicable
- Three copies of the site plans
- Certificate of Title dated within 30 days of the application
- Copies of applicable covenants and easements
- Strata corporation approval where applicable
- Required Letters of Assurance and professional liability insurance where applicable
- Proof of potable water for new dwellings, accessory suites and buildings containing fixtures
- Water Service Connection and Road Use Permit documentation where applicable
- Traffic Management Plan for construction valued over $250,000
- Homeowner Protection Certification for new dwellings
The Village’s current application checklist states that incomplete applications will not be accepted or processed. The package also states that payment is to be made by cash or cheque, payable to the Village of Belcarra.
Belcarra Projects May Need Additional Review
Fraser Health Filing
Belcarra relies on on-site septic systems. Where applicable, the building permit checklist requires proof that the required written sewage-disposal documentation has been filed with Fraser Health. Under the provincial Sewerage System Regulation, regulated sewerage-system work is carried out by an Authorized Person such as a Registered Onsite Wastewater Practitioner or professional engineer.
Shoreline and Watercourse Sites
The building permit checklist identifies additional environmental review for certain work near the shoreline and watercourses. It directs applicable intertidal and high-water-mark projects to Burrard Environmental Review Committee review and notes that work within 30 metres of a watercourse may trigger provincial riparian-area requirements and assessment by a Qualified Environmental Professional.
Construction Inspection Requirements
-
Simple buildings:
The Building and Plumbing Code Regulation Bylaw requires at least two business days’ notice to the Village when requesting an inspection. -
Inspection stages:
Required stages include foundation and footing forms before concrete, specified below-slab work, framing and rough-in work before concealment, insulation and vapour barrier, exterior membrane work, and the health-and-safety review before occupancy. -
Concealed work:
Work identified for inspection must not be concealed until it has received the building official’s required written acceptance. -
Complex buildings:
The bylaw requires at least three business days’ notice for the required pre-construction meeting and at least three business days’ notice for the pre-occupancy coordinated site review.
Use the Current Village Fee Schedule
Belcarra’s Fees and Charges Bylaw contains separate schedules for building permit and inspection services. Many building permit charges are based on the type of work and declared construction value, while separate charges apply to certain plumbing, inspection, re-inspection and related Building Department services. The current consolidated fee schedule should be used when preparing an application rather than relying on older permit amounts.
Official Permit Resources
Building
Belcarra Building Department
Open official resource →
Application
Building Permit Application Package
Open official resource →
Regulations
Village of Belcarra Bylaws
Open official resource →
Planning
Planning and Permit Forms
Open official resource →
Fees
Current Fees and Charges Bylaw
Open official resource →
Septic
Fraser Health Onsite Sewerage Systems
Open official resource →