Alexander Building Permit Office
Alexander
Rural Municipality of Alexander
204-367-6160
By appointment
1 Bouvier Trail, St. Georges, Manitoba
Building permits in the Rural Municipality of Alexander, Manitoba, are administered through the Winnipeg River Planning District (WRPD), a shared planning authority serving Alexander and the Town of Powerview-Pine Falls. The district’s Development Officer and Building Inspector coordinate local permit applications, zoning compliance and building inspections.
Permit services operate by appointment at the RM of Alexander municipal office in St-Georges. Applicants are instructed to arrange an appointment several days before applying. The municipality directs applicants to obtain permit forms through the planning office rather than a publicly advertised online building permit portal.
How to Apply for a Building Permit in Alexander
-
1
Check the Property’s Zoning
Identify the property’s zoning designation and confirm the proposed use, building location and setbacks with the Winnipeg River Planning District. A variance or conditional use approval may be necessary before the project can proceed.
-
2
Arrange a Permit Appointment
Contact the district office to schedule an appointment and obtain the appropriate development and building permit application materials. The district requests that appointments be arranged a few days in advance.
-
3
Submit Plans and Applications
Provide the required property information, scaled site plans and project documentation. The district reviews applicable zoning requirements and the building plans under the relevant Manitoba construction standards.
-
4
Obtain Approval Before Construction
Construction must not begin until the required permits have been issued. The permit office identifies applicable inspection requirements for the approved work.
Alexander’s municipal permit guidance includes construction, placement, additions, renovations, demolition and relocation of buildings, including replacement decks. The municipality specifically warns that building permits apply regardless of building size. A project exempt from a development permit under the zoning by-law is not automatically exempt from separate building permit requirements.
Alexander Zoning and Development Permit Requirements
Alexander’s Zoning By-law No. 08/20 regulates permitted land uses, building locations, setbacks, heights and other development standards. Its administration provisions distinguish development authorization from building code approval. Some proposals require both approvals, while a development permit may incorporate other permits where authorized.
The municipality’s digital property map provides zoning designations, parcel areas, roll numbers and property information. Projects involving conditional uses, zoning amendments or variances require the corresponding planning review rather than building permit approval alone.
Site Plan and Development Application Checklist
Section 6.5 of Alexander’s zoning by-law identifies the following documentation for development permit applications:
- Application submitted by the property owner or a person authorized in writing by the owner
- Scaled plan showing the shape and dimensions of the property
- Locations and dimensions of existing buildings and structures
- Proposed building location, dimensions, additions or alterations
- Existing and proposed uses of buildings, structures and land
- Vehicular access, utility connections, parking, loading, landscaping or signage details where applicable
- Relevant land titles, easements, caveats or surveyor’s certificates where necessary to establish compliance
- Applicable development permit application fee
Building permit drawings and technical requirements are determined separately according to the proposed construction and the applicable building code provisions.
Septic Systems and Winnipeg River Shore Land Projects
Septic and Onsite Wastewater Systems
Onsite wastewater system registration is administered by Manitoba Environment and Climate Change through regional Environment Officers, not through Alexander’s ordinary building permit process. Installations, replacements and modifications subject to provincial registration require authorization before work begins.
The province provides separate applications for disposal fields, holding tanks and septic tank replacements, including an online option for holding tank and septic tank replacement registration.
Manitoba Hydro Shore Land Approval
Eligible cottage owners proposing decks, docks, boathouses or other development on Manitoba Hydro shore land along the Winnipeg River System must obtain the applicable Hydro shore land authorization.
Manitoba Hydro requires shore land development review and an onsite inspection before issuing its approval letter. Following Hydro approval, the applicant must contact the appropriate municipality for any required building permit.
Building and Plumbing Inspections
The Winnipeg River Planning District’s building inspection function includes administering permits and conducting required building and plumbing inspections within its jurisdiction. Applicants should confirm the necessary inspection stages and scheduling arrangements with the district’s Building Inspector when the permit is issued.
-
Inspection coordination:
Winnipeg River Planning District Building Inspector. -
Inspection stages:
Determined by the approved construction work and applicable code requirements. -
Provincial jurisdiction:
Projects assigned to Manitoba Inspection and Technical Services require coordination with that authority rather than relying solely on the district’s local inspection process.
Official Alexander Permit Resources
Building & Planning
Winnipeg River Planning District Permit Office
Open official resource →
Zoning By-law
RM of Alexander Zoning By-law No. 08/20
View official document →
Property & Zoning
Alexander Municipal Property and Zoning Maps
Open official maps →
Planning Forms
Municipal Conditional Use, Variance and Rezoning Forms
View municipal forms →
Septic Systems
Manitoba Onsite Wastewater Registration and Applications
Open provincial resource →
Shore Land Permits
Manitoba Hydro Winnipeg River Shore Land Development
View approval requirements →