Altona Building Permit Office
Altona
Town of Altona
204-324-5357
manager@rpgamb.ca
109 3rd Avenue NE, Altona, Manitoba, R0G 0B0
Building permits in the Town of Altona, Manitoba, are administered through the RPGA Planning District, a shared planning authority serving Altona and the Municipality of Rhineland. Permit applications are processed through RPGA rather than the Town of Altona’s municipal office.
Under a service arrangement established in 2024, MSTW Planning District provides Part 9 and Part 3 building inspections. RPGA remains the initial application and planning contact, while MSTW provides technical inspection services. Completed applications and supporting drawings can be submitted to the RPGA Planning Manager by email or through the district office.
Altona building permit applications are submitted through the RPGA Planning District office at 109 3rd Avenue NE, inside the Municipality of Rhineland Civic Office. This is different from Altona’s Town Office at 111 Centre Avenue. Although the downloadable building permit application carries MSTW branding, RPGA reviews Altona applications before forwarding them for the applicable building review and inspection process.
How to Apply for a Building Permit in Altona
-
1
Confirm Development and Zoning Requirements
Contact RPGA to establish whether the proposed work complies with Altona Zoning By-Law 1792/2021 and whether a development permit or another planning approval is required.
-
2
Submit the Application and Drawings
Complete the appropriate permit form and submit it with the site plan and construction drawings to the RPGA Planning Manager at manager@rpgamb.ca or through the RPGA office.
-
3
Complete Payment and Permit Review
Sign the required paperwork and pay the applicable fees. Once the application is complete, it proceeds through the permit review process. MSTW contacts applicants when the building permit has been approved.
Building Permit Application Requirements
RPGA identifies the following information and drawings for building permit applications. The exact submission requirements depend on the proposed construction.
- Completed building permit application identifying the property, owner, applicant and proposed work.
- Site plan showing property boundaries, proposed construction and distances from property lines.
- Floor plans with room layouts and dimensions.
- Foundation plans, wall sections and structural framing details.
- Roof plans, building elevations and other construction details applicable to the project.
- Plumbing, electrical and heating or ventilation information when required.
- Approved development permit where applicable.
- Survey certificate, building location certificate or professionally prepared drawings when requested.
RPGA’s published requirements specify that trusses must have engineered designs and stamps. Additional engineering or architectural documentation may be necessary depending on the project.
Development Permits and Building Permits
Altona Zoning Review
Altona Zoning By-Law 1792/2021 requires development permits for specified activities, including constructing or enlarging buildings, structural alterations and certain changes in land or building use. The by-law also establishes exemptions for particular minor projects.
Development applications are assessed against permitted uses, setbacks, site configuration and other applicable zoning provisions. Variances or conditional-use approvals may be necessary for proposals that do not meet the applicable requirements.
Construction and Code Review
Building permits address construction requirements under the applicable Manitoba building and plumbing regulations. A development permit does not replace a required building permit.
RPGA coordinates the local application process and works with MSTW for building inspections. Applicants undertaking Part 3 construction are directed by RPGA to consult MSTW regarding the applicable submission requirements.
Projects That Require a Permit
RPGA’s published permit requirements identify several common projects requiring approval:
-
New construction and additions:
Construction of buildings exceeding 107 square feet and additions to existing buildings. -
Structural renovations:
Alterations affecting structural components, changes of occupancy and renovations exceeding the district’s stated $5,000 construction-value threshold. -
Basement development:
Basement finishing projects falling within RPGA’s permit requirements, including the applicable construction-value threshold. -
Decks and porches:
Enclosing an existing deck or porch requires a permit. Certain low, unenclosed decks are exempt under the district’s published rules. -
Demolition and plumbing:
Building demolition and the construction or alteration of plumbing systems require the applicable permits.
Some small accessory buildings, fences, non-structural maintenance and landscaping work may be exempt from building permits. An exemption does not automatically remove the obligation to comply with Altona’s zoning requirements.
Booking Building Inspections
MSTW Planning District provides building inspection services for Altona projects under its arrangement with RPGA. The approved permit identifies the inspections required for the construction.
-
Inspection booking:
Requests can be submitted using MSTW’s online inspection booking form or by calling 204-822-6223. -
Advance notice:
MSTW requests at least 24 hours, or eight working hours, of advance notice. -
Booking information:
The online form requires the permit number, inspection type, requested date and time, property location and applicant contact details. -
Confirmation:
MSTW administration confirms whether the requested inspection appointment can be accommodated.
RPGA’s permit information also describes refundable inspection deposits. Release of applicable deposits depends on completing the required inspections and satisfying the relevant final inspection, occupancy and lot-grading conditions.
Plumbing and Onsite Wastewater Responsibilities
RPGA and MSTW
Plumbing work involving new installations or changes to existing systems falls within the local permit process. RPGA handles the initial permit arrangements, with MSTW providing the applicable technical inspection services.
Provincial Environmental Regulation
Where a property requires a private onsite wastewater management system instead of municipal sewer service, Manitoba Environment and Climate Change administers the provincial registration and environmental inspection program. Onsite wastewater authorization is separate from the local building permit process.
Permit Fees, Deposits and Expiry
RPGA Fee and Charges By-Law 2025-02 directs residential and commercial building permit fees and deposits to MSTW’s current fee calculations. RPGA also establishes separate charges for development permits and other categories of approvals.
-
Permit validity:
RPGA states that approved building permits expire after two years. -
Extensions:
A 12-month extension is available under the district’s stated extension provisions and fee schedule. -
Work before approval:
RPGA warns that starting construction without the required permit can result in increased permit charges and complications with occupancy approval.
Official Altona Building Permit Resources
Permit Authority
RPGA Planning District
Open official resource →
Applications
Building and Development Permit Forms
Open official resource →
Requirements
RPGA Building Permit Requirements and FAQs
Open official resource →
Zoning
Town of Altona Zoning By-Law 1792/2021
View official by-law →
Inspections
MSTW Online Inspection Booking
Open inspection form →
Permit Fees
RPGA Fee and Charges By-Law 2025-02
View official fee by-law →