Building Permit Authority

Arborg Building Permit Office

Eastern Interlake Planning District

Active Last verified: 2026-09-27 Manitoba
Municipality
Arborg
Jurisdiction
Town of Arborg
Office Hours
Monday-Friday, 9:00 AM-4:30 PM
Address
62 2nd Avenue, Gimli, Manitoba, R0C 1B0
Google Maps Permit office location

Building permits in the Town of Arborg, Manitoba, are administered by the Eastern Interlake Planning District (EIPD), a shared planning authority serving Arborg, the Municipality of Bifrost-Riverton, the RM of Gimli and the Town of Winnipeg Beach. EIPD handles building permit applications, zoning administration and construction inspections for properties within Arborg.

Applications can be submitted through EIPD’s Cloudpermit system or in person at its office in Gimli. The Town of Arborg maintains its own zoning by-law, while separate provincial authorities handle subdivision approvals and onsite wastewater systems.

Local Permit Authority

Arborg building permit applications are processed by EIPD, not through a separate Town of Arborg Building Department. The EIPD office is located at 62 Second Avenue in Gimli. Applicants attending in person are asked to arrive by 4:00 p.m. to allow time for permit paperwork.

Permit Process

How to Apply for a Building Permit in Arborg

  1. 1

    Confirm zoning and permit requirements

    Contact EIPD to confirm the proposed construction complies with Arborg’s zoning by-law and determine whether a building permit, development permit or additional planning approval is required.

  2. 2

    Prepare the application documents

    Prepare the project drawings, site plan and other supporting documents applicable to the proposed work. EIPD provides construction detail templates for several project types.

  3. 3

    Submit through Cloudpermit or EIPD

    Create a Cloudpermit account to submit the application electronically, upload attachments and receive status notifications. In-person applications are also accepted at EIPD’s Gimli office.

  4. 4

    Obtain approval before construction

    Address any review requirements and obtain the approved permit before beginning the authorized work. Construction must follow the approved plans and applicable inspection requirements.

Application Documents

Building Permit Application Checklist

EIPD identifies the following documentation for building permit applications, depending on the construction project:

  • Completed building permit application through the approved submission process.
  • Site plan identifying the proposed structure, property boundaries, setbacks and distances between buildings.
  • Building drawings showing the proposed construction, including applicable floor plans, elevations, foundation details and structural components.
  • Existing and proposed construction details for building additions.
  • Professional engineering or architectural documentation where required by the Manitoba Building Code.
  • Owner authorization documentation when applicable to the application.

For new buildings, additions and relocated structures, EIPD requires sufficient site information to verify zoning setbacks. Where property lines cannot be accurately established, a Building Location Certificate or Staking Certificate from a Registered Manitoba Land Surveyor may be requested. EIPD also provides a site plan template for properties with clearly identifiable boundary markers.

Local Planning

Zoning, Development and Subdivision Approvals

Municipal Zoning

Arborg Zoning Requirements

The Town of Arborg Zoning By-law No. 6-2011, as amended, regulates land use, building locations and development standards. EIPD administers zoning applications, while Town Council retains responsibility for major zoning changes and applicable municipal decisions.

Development Approval

Development Permits and Land Use

EIPD identifies separate development permits for certain large commercial developments and agricultural buildings. Projects requiring a conditional use approval or variance must follow the applicable planning process before proceeding with construction authorization.

Provincial Approval

Subdivision Applications

Subdivision applications for Arborg are submitted to Manitoba’s Community and Regional Planning Branch in Selkirk. EIPD and Town Council participate in the review process, but the provincial branch provides final subdivision approval.

Commercial Occupancy

Occupancy Permits

EIPD requires occupancy permits for applicable commercial and public-use premises, including certain changes in occupancy. A building inspection addresses code and fire-safety requirements before occupancy authorization is issued.

Inspections

Building Inspection Requests in Arborg

EIPD conducts construction inspections associated with approved building permits. The approved permit identifies the inspection stages required for the particular project.

  • Advance notice:
    EIPD requires at least 24 hours’ notice before a requested construction inspection.
  • Booking method:
    Inspections can be requested through Cloudpermit for permits managed in that system, or by contacting EIPD by telephone or email.
  • Booking details:
    Provide the applicant’s name, telephone number, permit number, required inspection and preferred inspection date and time.
  • Inspection stages:
    Depending on the approved project, inspections may cover foundations, framing, plumbing, insulation, vapour barriers and final construction.
  • Responsibility:
    EIPD identifies both the property owner and contractor as responsible for notifying its office when inspections are required.
Septic Systems and Plumbing

EIPD includes new plumbing installations and alterations within its building permit requirements. Onsite septic fields, holding tanks and related wastewater systems are regulated separately by Manitoba Environment and Climate Change through its onsite wastewater registration and inspection program. Provincial authorization may be required before installation or modification of these systems.

Permit Fees

Building Permit Fees and Deposits

EIPD calculates building permit fees according to the scope of the proposed work. Its published Fee and Deposit By-law 05-2025 provides the district’s fee framework. A permit deposit is also collected and may be refunded after project completion when applicable conditions, including required inspections, have been satisfied.

Cloudpermit supports electronic permit payments, including credit cards and e-transfers. EIPD identifies an additional 2.4% surcharge for credit-card payments. Applicable charges should be confirmed against the current official fee schedule.

Official Links

Official Arborg Building Permit Resources

Scroll to Top