Argyle Building Permit Office
Argyle
Rural Municipality of Argyle
204-523-2080
By appointment
110 Rea Street, Dunrea, Manitoba, R0K 0S0
Building permits in the Rural Municipality of Argyle, Manitoba, are administered by the Pelican-Rock Lake Planning District, a shared authority serving Argyle, Cartwright-Roblin Municipality and the Rural Municipality of Prairie Lakes. The district handles building and development permit applications, zoning administration and building-code compliance.
Applications are handled through the planning district office in Dunrea rather than the Argyle municipal office in Baldur. The district provides separate development, building/plumbing and demolition application forms. Its office operates by appointment, and applicants are directed to submit permit applications at least two weeks before construction is expected to begin.
Argyle does not operate a separate municipal building permit department for the district-administered permit process. The Pelican-Rock Lake Planning District administers the applicable local zoning and building requirements. Projects falling under provincial inspection jurisdiction may require separate review by Manitoba Inspection and Technical Services.
How to Apply for a Building Permit in Argyle
-
1
Confirm Development Approval
Contact the Pelican-Rock Lake Planning District to establish whether a development permit is required and whether the proposed land use and building location comply with zoning requirements.
-
2
Prepare the Required Application
Complete the appropriate district form and assemble the site plan, construction drawings and project information required for review.
-
3
Submit for Permit Review
Lodge the completed application and supporting drawings with the Building Inspector. Construction requiring authorization must not begin until the applicable permits have been issued.
Development Permits and Building Permits
Development Permit
Addresses the proposed use of land, building placement, setbacks and compliance with the district zoning by-law. The district’s development application states that building permits will not be issued until the required development approval has been obtained.
Building and Plumbing Permit
Addresses construction and applicable plumbing requirements under the Manitoba Building Code and Argyle’s building by-law. The district uses a combined Building/Plumbing Permit Application.
Projects that do not comply with zoning requirements may need additional approval. The district provides conditional use applications, variation orders and minor variation applications. Conditional uses and standard variation orders involve public hearings; eligible minor variations of up to 15% may be processed without a public hearing.
Plans and Information Required for Review
The planning district publishes separate site-plan and dwelling-construction drawing requirements. The applicable submission should include the following information.
- Property legal description, civic address and north arrow.
- Property boundaries, dimensions and adjacent roads or public rights-of-way.
- Locations and dimensions of existing structures, including septic, water and underground utility installations.
- Proposed building location, dimensions and distances from property boundaries.
- Existing and proposed driveways, parking areas and walkways.
- Foundation and footing drawings for dwellings, stamped by a professional engineer registered in Manitoba.
- Floor plans, elevations, roof-system details and construction cross-sections for dwelling applications.
- Plumbing layouts showing sewer, water and radon capture systems where applicable.
The district accepts a Google Earth image as a property layout drawing when relevant measurements and building locations are marked. Dwelling construction drawings must use a minimum scale of 1:100 under the district’s published requirements.
Accessory Buildings, Farm Buildings and Demolition
-
Small accessory buildings:
Argyle Building By-law No. 4-2018 provides an exemption for accessory storage buildings not exceeding 200 square feet, subject to the concurrence of the authority having jurisdiction. The district’s general FAQ describes a broader 299-square-foot building-permit exemption. The Building Inspector should confirm the applicable requirement for an Argyle property before construction proceeds without a permit. -
Farm buildings:
Argyle’s by-law contains exemptions for qualifying farm buildings, excluding farm residences and attached garages or carports. Large farm buildings exceeding 600 square metres are identified as falling under provincial fire commissioner jurisdiction. -
Demolition or removal:
The district provides a separate Removal or Demolition Application and requires the accompanying waiver when submitting the application. -
Permit validity:
The district’s building and development application forms state that permits are valid for one year from issuance and become invalid if no authorized activity occurs during that period.
Construction Inspections and Occupancy
Argyle’s published building by-law requires owners to notify the authority having jurisdiction before starting work, before covering work identified for review, and upon completion before occupancy. Inspection arrangements and applicable construction hold points should be confirmed directly with the district’s Building Inspector.
-
During construction:
Keep the approved plans available at the worksite and display the issued permit as required by the municipal building by-law. -
Before covering work:
Provide sufficient notice for any inspection or audit stage directed by the authority. -
Occupancy approval:
Obtain an occupancy permit where required. The Argyle by-law identifies exceptions for qualifying owner-constructed and owner-occupied single-family dwellings.
Septic Systems and Municipal Sewer Connections
On-site wastewater systems are regulated provincially rather than through the district’s building permit process. Provincial authorization is required before installing an on-site wastewater system or making a new connection to an existing system.
The district identifies Baldur and Belmont among the communities with municipal sewage systems. Properties served by these systems must use the available municipal service, with connection information obtained from the municipal office. For properties without municipal sewer service, the applicable provincial wastewater requirements must be addressed separately. The district also specifies septic holding tanks for cottage lots in its Seasonal Recreation (SR) Zone.
Official Argyle Permit Resources
Applications
Development, Building and Plumbing Permit Forms
Open official forms →
Regulations
Argyle Building By-law and District Zoning Documents
View official by-laws →
Local Authority
RM of Argyle Planning District Information
View municipal resource →
Permit Requirements
Planning District Permit FAQs
Review permit guidance →
Wastewater
Septic Systems and Municipal Sewer Requirements
View wastewater guidance →