Beausejour Building Permit Office
Beausejour
Town of Beausejour
204-268-6705
admin@brpd.ca
72013 Road 42E, Beausejour, Manitoba, R0E 0C0
Building permits in the Town of Beausejour, Manitoba, are issued by the Brokenhead River Planning District (BRPD), a joint planning authority serving Beausejour and the Rural Municipality of Brokenhead. The District administers building permits, zoning compliance, development applications and construction inspections rather than operating as a separate Town of Beausejour Building Department.
Applications are handled through the District’s published permit forms and administrative office. New construction also requires municipal lot grading approval before the building permit application proceeds. Permit requirements depend on the proposed work, applicable zoning and building classification.
Effective January 9, 2025, the Brokenhead River Planning District also became the building permit authority for Part 3 structures in Beausejour and the RM of Brokenhead. Commercial, multi-family and industrial projects classified under Part 3 of the Manitoba Building Code are therefore directed to the District, which provides separate Part 3 building and plumbing application forms.
How Building Permit Applications Work in Beausejour
-
1
Confirm Zoning and Preliminary Approvals
Check the proposed construction against Beausejour’s zoning requirements. For new construction, obtain the required lot grade permit from the Town before submitting the building permit application.
-
2
Select the Appropriate Application
Use the District’s new-construction building permit form or the applicable development, renovation, garage, deck, pool, fence, demolition or plumbing permit form. An authorization letter is required when the applicant is not the property owner.
-
3
Submit Plans for District Review
Provide the completed application and supporting drawings to the Brokenhead River Planning District. The District publishes downloadable forms and requires both hard-copy and electronic blueprint sets for the construction applications described in its building requirements.
-
4
Obtain Permit Approval Before Construction
The District’s published instructions ask applicants to allow up to 15 working days for processing. Construction must not begin before the required permit has been issued.
Documents and Plans for Building Permit Applications
The District’s building permit requirements identify the following information for construction applications:
- Complete legal description, civic address and tax roll account number for the property.
- Property owner’s name, mailing address and contact information.
- Contractor’s name, mailing address and contact information.
- Site plan showing existing structures, proposed construction and distances from property boundaries.
- Two complete blueprint sets: one hard copy and one PDF, with the required professionally engineered foundation plan.
The District’s published requirements also specify engineered stamped drawings for accessory buildings and garages exceeding 899 square feet, effective July 1, 2024. Preserved wood foundations require an engineer’s written assurance concerning design and inspection responsibilities.
Applicants uncertain about property setbacks are advised by the District to have the site plan reviewed before final construction drawings are prepared.
Zoning Approval and Municipal Lot Grading
Zoning and Development Decisions
BRPD administers Beausejour’s zoning requirements, variation applications, conditional uses and zoning amendments. Town of Beausejour Zoning By-law No. 1831-26 regulates land use and development within the town boundaries.
Where a proposal does not comply with applicable zoning provisions, a variation or other planning approval may be necessary before the building permit can proceed.
Lot Grade Permits
For new residential and commercial construction, the District directs applicants to obtain a lot grade permit through the respective municipal office before applying for the building permit.
In Beausejour, this approval is handled by the Town and establishes grading requirements intended to manage surface drainage around buildings.
Additional Approvals Outside the Building Permit
-
Provincial road access:
Projects requiring access from a provincial road or highway may need Manitoba’s highway access approval before the District processes the building application. -
Electrical work:
Electrical permits are obtained through Manitoba Hydro rather than the Brokenhead River Planning District. -
Plumbing:
BRPD publishes plumbing permit applications, including a separate Part 3 plumbing form for applicable larger buildings. -
Septic systems:
Onsite wastewater systems are administered through Manitoba Environment and Climate Change’s Onsite Wastewater Management Systems program. This is separate from the District’s building permit process.
Scheduling Construction Inspections
The Brokenhead River Planning District’s Building Inspector coordinates inspections for permitted construction. Inspection arrangements are made through the District rather than the Town’s general municipal administration.
-
Inspection scheduling:
Monday to Friday, between 8:30 a.m. and 4:30 p.m. -
Advance notice:
At least 24 hours’ notice is requested for inspections. -
After-hours inspections:
The District’s published inspection information lists an additional $225 charge. -
Inspection contact:
Building Inspector Shawn Bullman can be contacted through the District office to arrange required inspections.
Part 3 Building Permit Requirements
BRPD’s Part 3 application instructions apply to larger and more complex buildings identified under the Manitoba Building Code. The District lists additional documentation for these applications, including:
- A current Status or Certificate of Title, dated within 30 days.
- Applicable professional letters of assurance for building design and inspection.
- A site plan identifying building dimensions, property boundaries, parking and loading areas.
- Architectural, structural and mechanical drawings.
The commercial permit information page provides the dedicated Part 3 building and plumbing application forms.
Permit Office and Current Fee Information
The District’s contact information lists 72013 Road 42E, Box 1330, Beausejour, Manitoba. This is distinct from Beausejour Town Hall at 639 Park Avenue, which handles municipal services including lot grading matters. Applicants should confirm delivery arrangements with BRPD before submitting physical construction plans.
The District’s permit application page links to a fee schedule effective January 1, 2026. The applicable fee should be checked against that schedule for the specific permit category before submission.
Official Beausejour Building Permit Resources
Applications & Fees
Building Permit Forms and 2026 Fee Schedule
Open official resource →
Building Requirements
BRPD Building Permits and Regulations
Open official resource →
Inspections
Building Inspection Scheduling Information
Open official resource →
Zoning & By-Laws
Beausejour Zoning, Building and Lot Grade By-Laws
Open official resource →
Part 3 Buildings
Commercial Building and Plumbing Permit Applications
Open official resource →
Provincial Septic
Manitoba Onsite Wastewater Management Systems
Open official resource →