Building permits in the Municipality of Bifrost-Riverton, Manitoba, are administered by the Eastern Interlake Planning District (EIPD), rather than a separate municipal building department. EIPD handles building and development permit applications, zoning reviews and construction inspections through its office in Gimli.
Applications can be submitted through Cloudpermit, with in-person assistance available at EIPD’s office at 62 Second Avenue in Gimli. Projects must comply with the Manitoba Building Code and Bifrost-Riverton’s zoning and building by-laws. Certain land-use decisions also require municipal council approval.
Bifrost-Riverton is one of four municipalities served by EIPD. Building permit applications and inspection arrangements are handled through the planning district, not the Bifrost-Riverton municipal office in Arborg. Subdivision approvals follow a separate provincial process through Manitoba’s Community and Regional Planning Branch in Selkirk.
How to Obtain a Building Permit in Bifrost-Riverton
-
1
Confirm Zoning and Permit Requirements
Check the property’s zoning under Bifrost-Riverton Zoning By-Law 04-2024. EIPD can identify applicable setbacks, permitted uses and any additional planning approvals required before construction.
-
2
Prepare the Application Documents
Assemble the site plan, building drawings and supporting documentation required for the proposed work. Survey documentation may be necessary to establish property boundaries and building placement.
-
3
Submit the Application to EIPD
Apply through Cloudpermit, which supports document uploads, application tracking, communications and permit payments. EIPD also provides application assistance at its Gimli office.
-
4
Obtain Approval and Arrange Inspections
Construction requiring a permit must not begin until the permit is approved. Required inspections are arranged with EIPD as work reaches the stages specified on the issued permit.
Plans, Surveys and Supporting Documents
EIPD identifies the following documentation for building permit applications, depending on the project:
- Completed building permit application through Cloudpermit.
- Construction drawings showing the proposed building, dimensions, floor plans, elevations and relevant structural details.
- Site plan identifying the proposed structure, existing buildings, property lines and distances between structures and property boundaries.
- Building Location Certificate or Staking Certificate from a Registered Manitoba Land Surveyor when accurate property boundaries cannot otherwise be established.
- Applicable project-specific drawings, engineering certifications or authorization forms.
EIPD’s survey guidance allows a site plan template where property pins can be located and boundaries accurately identified. A surveyor’s certificate may be requested where those conditions cannot be met. New houses and additions require complete construction drawings, and EIPD provides project-specific forms for decks, accessory buildings and additions.
Bifrost-Riverton Zoning and Development Approvals
Bifrost-Riverton Zoning By-Law 04-2024, adopted September 12, 2024, establishes land-use regulations throughout the municipality. The applicable zoning maps determine the property’s zone, while the by-law establishes permitted and conditional uses, setbacks and other development restrictions.
Permit Review
EIPD reviews construction applications against building requirements and municipal zoning regulations. Development permit requirements must also be addressed where applicable, including certain agricultural and larger commercial developments.
Variances and Conditional Uses
Proposals that do not comply with zoning requirements may need a variance. Conditional uses require approval under the municipal planning process. EIPD administers these applications, while council makes decisions where required under The Planning Act.
Requesting Construction Inspections
EIPD conducts inspections associated with approved building permits. The district requires at least 24 hours’ notice before an inspection. Property owners and contractors share responsibility for requesting inspections at the appropriate construction stages.
-
Booking method:
Request inspections through Cloudpermit, or contact EIPD by telephone or email. -
Information required:
Applicant name, telephone number, permit number, inspection type and preferred inspection date and time. -
Inspection stages:
May include footings and foundations, framing and plumbing, insulation and vapour barrier, and final inspection. The approved permit identifies the required stages. -
Online tracking:
Cloudpermit allows applicants to request or cancel inspections and monitor inspection status.
Septic Systems and Other Agency Responsibilities
Septic Fields and Holding Tanks
Septic system inquiries are handled separately from EIPD building permit reviews. EIPD directs Bifrost-Riverton applicants to the Manitoba environment officer responsible for septic fields and holding tanks in the municipality.
Electrical and Municipal Works
Electrical permits are directed to Manitoba Hydro. Matters involving culverts, driveway installations, municipal sewer and water connections, or public reserves should be referred to the Bifrost-Riverton municipal office.
Building Permit Fees and Inspection Deposits
EIPD calculates building permit fees according to the scope of the proposed work. Its published Fee and Deposit By-Law 05-2025 provides the district’s fee structure.
EIPD also collects a refundable deposit with permit applications. Refund eligibility depends on satisfactory project completion and fulfilment of conditions, including completion of required inspections. The district accepts several payment methods, including e-transfer and credit card; credit card payments carry a 2.4% surcharge.
Official Bifrost-Riverton Permit Resources
Applications
EIPD Building Permit Application and Cloudpermit
Open official resource →
Zoning
Bifrost-Riverton Zoning By-Law 04-2024 and Maps
Open official resource →
Documentation
Survey Requirements and Site Plan Template
Open official resource →
Inspections
Building Inspection Requirements and Booking
Open official resource →
Fees
EIPD Fee and Deposit By-Law 05-2025
Open official resource →
Other Authorities
Septic, Electrical and Municipal Service Contacts
Open official resource →