Armour Building Permit Office
Armour
Township of Armour
Monday-Friday, 9:00 AM-4:30 PM
56 Ontario Street, Burk's Falls, Ontario, P0A 1C0
Building permits in the Township of Armour are administered by the Township’s Building Department. Armour uses Cloudpermit as its primary digital system for building permit applications, supporting documents, drawings and inspection requests.
Land-use compliance should be addressed before construction proceeds. Depending on the property and proposal, zoning, site plan control, a minor variance, rezoning or another planning approval may need to be resolved separately from the building permit.
How the Armour Building Permit Process Works
-
1
Confirm the Property Can Support the Project
Check the property’s zoning and any applicable planning controls before finalizing the permit submission. Site plan control or another planning approval can affect whether and where development may proceed.
-
2
Submit the Building Permit in Cloudpermit
Armour directs building permit applicants to complete the application and upload the required forms, attachments and drawings through Cloudpermit. Other submission formats may be accepted, but the Township applies an additional submission fee to non-digital applications.
-
3
Complete the Required Review
The Building Department reviews the submission against the Ontario Building Code and applicable municipal requirements. Changes to approved permit drawings require approval from the Building Department.
-
4
Request Inspections at the Required Stages
Construction must remain available for the applicable inspections before work that requires inspection is covered or advanced beyond the relevant stage.
Armour’s permit responsibilities changed in 2026 for private on-site sewage systems. Effective May 1, 2026, the Township of Armour became responsible for sewage system permits, inspections and enforcement within the Township, replacing the previous North Bay-Mattawa Conservation Authority approval role for these local systems.
Planning Approval Is Separate From the Building Permit
Zoning and Development Applications
The Township’s Planning Services handles local planning and development matters such as zoning by-law amendments, minor variances, site plan matters and related development applications. Pre-consultation is available for projects that require a planning application.
Consent and Severance Authority
The Southeast Parry Sound District Planning Board is the governing authority for land division in Armour. A consent or severance therefore follows a different approval route from a Township building permit, even when subsequent zoning or building approvals are also required.
Building Inspection Scheduling in Armour
-
Inspection days:
The Building Department conducts inspections on Monday, Wednesday and Friday. -
Request deadline:
Building inspection requests are to be made by 3:30 p.m. on the day before the requested inspection, unless the inspection is being requested for a later date. -
Booking methods:
Inspection requests can be submitted through Cloudpermit or arranged with the Building Department by email or telephone. -
Construction changes:
Revisions that change the approved permit drawings require Building Department approval rather than being left for the next inspection.
Septic Permits Are Now Handled by Armour
The Township’s Building Department administers permits for private on-site sewage systems on properties within Armour and provides the associated inspection and enforcement services. The Township also directs sewage system applications through Cloudpermit.
An on-site sewage system permit can be relevant to projects such as a new home or cottage, certain additions involving bedrooms or plumbing, replacement of an existing tank or leaching bed, holding tanks and other regulated private sewage work. Projects involving larger sewage systems can fall outside the Township’s Part 8 approval role.
Check Zoning Before Relying on a Permit Exemption
A structure that does not require a building permit can still be subject to Armour’s Zoning By-law. For example, the Township notes that qualifying small storage sheds may be exempt from a building permit under the Ontario Building Code, but the structure must still comply with municipal requirements such as setbacks and lot coverage.
Waterfront and site-plan-controlled properties can also involve additional requirements. Armour’s inspection material states that properties subject to Site Plan Control require an Ontario Land Surveyor-prepared building location plan and verification of the foundation location before construction proceeds above grade.
Official Armour Permit Resources
Building
Township of Armour Building Permits
Open official resource →
Online Application
Cloudpermit Permit Portal
Open permit portal →
Planning
Township of Armour Planning Department
Open official resource →
Septic
On-Site Sewage System Program
Open official resource →
Land Division
Southeast Parry Sound District Planning Board Consents
Open official resource →