Google Maps Permit office location

Building permits in Adstock, Quebec are issued by the Municipality’s Service de l’urbanisme et de l’environnement. The same municipal service manages land-use planning, reviews construction and renovation projects, issues authorization certificates and administers local development requirements.

Adstock provides a fully online permit service for submitting a request, following its status and completing payment when requested. The Municipality is currently experiencing a high volume of applications and recommends submitting a complete file at least one month before the planned start of work.

Permit Process

How Building Permit Applications Work in Adstock

  1. 1

    Check the project against municipal rules

    Adstock’s Urbanism Regulation No. 299-24 establishes the zoning, construction and land-development requirements that apply across the municipality. The municipal interactive map can also be used to identify zoning information for a property.

  2. 2

    Submit the permit request

    Applications can be completed through Adstock’s online permit system. The Municipality also maintains project-specific forms for principal buildings, accessory structures, renovations, pools, tree cutting, soil disturbance and other authorization certificates.

  3. 3

    Municipal review

    The Urbanism and Environment Service reviews the proposed work against the regulations and any applicable land-use requirements. Additional information may be requested when the submitted file is incomplete or the project requires another municipal authorization.

  4. 4

    Track, pay and receive the permit

    The online service allows an applicant to follow the request and see when payment is required. Once the process is complete, the issued permit is sent electronically and can be printed.

Local Permit Note

Adstock reports particularly heavy permit activity during the construction season. Its current permit page asks applicants to submit complete files at least one month before work is expected to begin rather than waiting until the project start date.

Local Approvals

Building, Planning and Septic Permits

Planning

Zoning Review and Other Planning Requests

Planning and building functions are handled within the same municipal service, but a building permit does not replace a separate planning approval when one is required. Adstock maintains separate procedures for matters such as minor variances and other authorization certificates.

Septic

On-Site Septic Installations

Septic installation permits are issued through the Municipality of Adstock. Municipal permit records continue to identify septic installations as a separate permit type, including permits issued during 2026, so a building project involving a new private wastewater system may require both construction and septic approvals.

Waterfront Areas

Soil Disturbance Near Lakes and Watercourses

Additional Authorization May Be Required

Adstock has a specific soil-disturbance application for work within 300 metres of the high-water line of Lac du Huit, Lac à la Truite, Lac Jolicoeur, Lac Bolduc, Lac Rochu and Grand lac Saint-François, as well as within 100 metres of the high-water limit of a watercourse. This authorization is separate from the principal building or renovation permit when the project falls within the regulated area.

Online Service

Adstock’s Electronic Permit System

  • New applications:
    The municipal eDemande portal accepts online permit requests.
  • Application status:
    A separate online request page allows applicants to follow an existing permit file.
  • Payment:
    The portal indicates when payment is required and supports credit-card payment as part of the online process.
  • Issued permit:
    After the required steps are completed, the permit is delivered electronically for printing.