Building Permit Authority

Albertville Building Permit Office

Inspection municipale / Urbanisme

Active Last verified: 2026-09-27 Quebec
Municipality
Albertville
Jurisdiction
Municipalité d'Albertville
Address
1058 rue Saint-Raphaël, Albertville, Quebec, G0J 1A0
Google Maps Permit office location

Building permits and municipal authorization in Albertville, Québec are administered under the municipality’s own planning and construction regulations, but the inspection service is provided through the MRC de La Matapédia. Albertville is one of the municipalities served by the MRC’s municipal inspection service, with an assigned building and environment inspector handling permit and certificate requests.

The arrangement is important for applicants because the principal inspector’s office is at the MRC office in Amqui rather than at Albertville’s municipal office. The municipality advises making an appointment before travelling; during the summer period, the assigned inspector is also present at the Albertville municipal office one day per week.

Local Permit Note

Albertville does not operate a standalone full-time building permit counter with its own local inspector. Municipal regulations remain the rules applied to projects in Albertville, while inspection services are delivered through an agreement with the MRC de La Matapédia. Permit questions should therefore be coordinated with the inspector assigned to Albertville rather than assuming that applications are handled only at the municipal office.

Permit Process

How the Albertville Permit Process Works

  1. 1

    Confirm the Required Permit or Certificate

    Albertville requires municipal authorization for a broad range of work, including construction, additions, renovations, demolition, changes of use, septic work, wells, pools, signs, excavation, filling and certain other property alterations.

  2. 2

    Contact the Assigned Inspector

    The MRC de La Matapédia assigns a building and environment inspector to Albertville. The inspector can identify the applicable municipal form and the plans or supporting documents required for the specific project.

  3. 3

    Submit the Municipal Application

    The permit by-law requires construction permit applications to be presented to the inspector on a municipal form with the project information and supporting plans required by the regulation.

  4. 4

    Wait for the Written Decision

    Albertville’s permit regulation gives the building inspector 30 days from presentation of the application to advise the applicant in writing whether the request is approved or refused. Work requiring authorization must not begin before the permit or certificate is issued.

Application Documents

Construction Permit Documentation

For a construction permit, Albertville’s regulation requires enough information for the inspector to understand the nature, location and use of the proposed work. Required documentation varies with the project, but the regulation specifically addresses plans, elevations, sections and sketches and establishes requirements for site-location documentation.

  • Municipal permit application completed for the proposed work
  • Scaled plans, elevations, sections or sketches needed to describe the construction
  • Property and project-location information required by the permit regulation
  • An implantation certificate when required for the particular project
  • Any additional information needed to demonstrate compliance with zoning, construction or other applicable municipal regulations
2025 Implantation Certificate Changes

Regulation 2025-04 changed Albertville’s implantation-certificate rules. When required, the certificate must be prepared and signed by a land surveyor and identify matters such as the lot, proposed and existing buildings, relevant distances, nearby wetlands, flood zones, lakes or watercourses, and slopes greater than 25%. The amendment also identifies projects for which this certificate can be optional, including certain alterations, smaller detached accessory-building projects, accessory structures, septic-system work and agricultural buildings.

Local Approvals

Planning Review and Septic Work

Planning

Municipal Zoning Compliance

The assigned inspector reviews permit requests against Albertville’s permit, zoning, construction and subdivision regulations and any other municipal rules applicable to the project. This means zoning compliance is part of the municipal authorization process rather than a separate generic building-permit review.

Septic

Septic Systems Are Included

Construction or modification of a septic installation requires a construction permit in Albertville. Questions concerning wastewater disposal are handled through the same assigned municipal inspection service, making septic work part of the local permit system rather than a separate health-unit permit process.

Recent Process Change

Updated Septic and Foundation Procedures

Regulation 2025-04, in force since August 14, 2025, changed two inspection-related procedures that are particularly relevant to current projects. Albertville removed the former requirement for the building and environment inspector to validate the location of a building before its foundation is poured.

For septic installations, the amendment replaced the former pre-burial validation approach with post-work documentation. No later than 30 days after the septic installation is buried, the person responsible for the work must provide the inspector with the prescribed photographic record and a signed compliance attestation. The regulation specifies photographs of the completed disposal field, the septic tank before burial, certification and capacity information visible on the tank, and the buried installation.