Alleyn-et-Cawood Building Permit Office
Alleyn-et-Cawood
Municipalité d'Alleyn-et-Cawood
819-467-2941
10 chemin Jondee, Danford Lake, Quebec, J0X 1P0
Building permits in Alleyn-et-Cawood are administered locally by the Municipality of Alleyn & Cawood through its Urban Planning service and Municipal Inspector. Municipal authorization is required before starting projects such as new construction, additions, renovations, repairs, demolition, building relocation and septic-system work.
Applications are reviewed for compliance with applicable municipal, provincial and regional requirements. If the proposed work complies with the rules in effect, the Municipality contacts the owner or applicant to proceed with issuance of the required permit or certificate of authorization.
How Permits Are Handled in Alleyn-et-Cawood
-
1
Check the property and zoning
Alleyn & Cawood is divided into zones under Zoning By-law 07-037. The municipal zoning plans identify the applicable zone, while the specification grid indicates the groups and classes of uses permitted within each zone.
-
2
Prepare the permit request
Prepare the property and project information requested by the Municipality, together with any plans, documents, sketches or other supporting material needed to describe the proposed work.
-
3
Submit the application
The Municipality directs permit and certificate applications to the Municipal Inspector. The official permit instructions allow completed application material to be submitted by mail or by email to inspection@alleyn-cawood.ca. The Municipality also maintains an online Permit Application page.
-
4
Wait for municipal authorization
The Municipality reviews the request against the applicable municipal, provincial and regional rules. If the application complies, the owner or applicant is contacted so the permit or certificate of authorization can be issued. Required authorization should be obtained before work begins.
Alleyn & Cawood uses a guarantee-deposit system for designated permit categories. By-law 2024-003 replaced By-law 2023-001 and sets requirements for the return of an applicable deposit. These include proof that residual materials were properly disposed of, photographs of the completed work, a completed permit-closure form and the signed permit application. Required closure documents must be received within 90 days after the permit or certificate of authorization expires.
Information to Prepare for the Municipal Request
- Owner name and contact information
- Property address and assessment-roll information
- Confirmation of whether the property is waterfront, when requested
- Description of the proposed work or authorization being requested
- Relevant plans, documents, sketches and other supporting material
Project-specific requirements can vary, so applicants should confirm the documents needed for their particular permit with the Municipal Inspector before submitting the request.
Permit questions can be directed to the Municipality’s inspection service at inspection@alleyn-cawood.ca or by telephone at 819-467-2941 ext. 104.
Building, Zoning and Septic Review
Municipal Permit Authority
The Municipality handles permit authorization for construction, modifications, renovations, repairs, additions, reconstruction, demolition and the relocation of buildings or structures. The Municipal Inspector is the local contact for permit administration.
Property-Specific Rules
Zoning By-law 07-037 divides the municipal territory into individual zones. The zoning plans and specification grid identify the applicable zone and the groups and classes of uses permitted there, making the property’s zoning an important part of project review.
Septic Permits Are Municipal
Septic installations are specifically listed by the Municipality among projects requiring authorization from the Municipal Inspector. Quebec’s Regulation respecting waste water disposal systems for isolated dwellings (Q-2, r. 22) is also identified among the provincial rules relevant to local urban-planning administration.
Fees, Deposits and Permit Closure
Alleyn & Cawood publishes a fee schedule covering building, renovation, addition, septic-system, well, subdivision and certificate categories. Some permit categories require a guarantee deposit in addition to the normal permit fee. Applicants should check the current municipal fee schedule before submitting a request.
The permit itself is administered by the Municipality of Alleyn & Cawood. Under By-law 2024-003, information collected during the permit application and permit-closure process is shared with the MRC Pontiac Evaluation Department to support property-assessment administration.