Amos Building Permit Office
Amos
Ville d'Amos
172 1re Rue Est, Amos, Quebec, J9T 2G1
Building permits in Amos, Québec are administered by the Ville d’Amos Service de l’urbanisme. The same municipal service applies zoning and construction regulations, issues permits and certificates, administers approvals for private septic systems and groundwater works, and carries out inspections across the city.
Permit and certificate applications can be filed through the City’s online application system. Project requirements depend on the property’s zoning, the type of work and, importantly, whether the property is in the Saint-Félix-de-Dalquier sector that became part of Amos in 2025.
Amos and Saint-Félix-de-Dalquier were amalgamated effective January 1, 2025, but permit administration has not yet become completely uniform. The City’s current permit page states that a different permit-fee structure still applies in the Saint-Félix-de-Dalquier sector. Municipal records from 2026 also continue to apply zoning by-law No. 240 of the former Municipality of Saint-Félix-de-Dalquier to properties in that sector. Projects there should therefore be reviewed against the regulations applicable to the specific property rather than automatically using the main Amos zoning rules.
How the Amos Permit Process Works
-
1
Confirm the Property Rules
The Service de l’urbanisme reviews zoning and other municipal requirements. For properties outside the Saint-Félix-de-Dalquier sector, the City publishes urban and rural zoning maps together with specification grids for individual zones.
-
2
Prepare the Project Documents
The supporting material depends on the work. A new principal building, for example, requires construction plans and a site plan prepared by a land surveyor.
-
3
Submit the Application
Applications can be submitted through the City’s dedicated online permit system. The municipal permit information also directs applicants to the Service de l’urbanisme when assistance is required.
-
4
Receive the Permit Before Starting
Work may begin only after the required permit or authorization certificate has been issued and its applicable conditions have been satisfied. Permit fees can be paid online or at City Hall.
Planning, Building and Inspections Are Handled Together
Property-Specific Review
The Service de l’urbanisme administers zoning, subdivision, construction, PIIA and other municipal planning regulations. Building placement and permitted uses therefore need to be checked against the regulation applicable to the property before permit issuance.
Municipal Permit Authority
Amos issues its own municipal permits and authorization certificates through the Service de l’urbanisme rather than relying on a county, MRC or neighbouring municipality for routine building-permit administration.
City Inspection Responsibility
The Service de l’urbanisme is also responsible for inspections throughout the municipal territory, keeping permit review, zoning enforcement and municipal inspections within the same service.
Documents for a New Principal Building
The City specifically identifies the following documents for an application to construct a new principal building:
- Site plan prepared by a land surveyor
- Construction plans
For an expansion of an existing building, the City accepts a surveyor-prepared site plan or a copy of a certificate of location showing the affected building that is less than 15 years old, together with the construction plans.
Septic Systems Are Also Permitted by Amos
A separate authorization certificate is required for the construction, renovation, modification, relocation or enlargement of a septic installation. The Service de l’urbanisme administers these applications while applying Québec’s regulation respecting wastewater disposal systems for isolated dwellings.
- Report prepared by a specialized firm containing the information required by the provincial regulation, including soil evaluation
- Scaled plan containing the information required by the provincial regulation
The City’s current contact directory lists the Service de l’urbanisme at 172, 1re Rue Est, while the main Hôtel de ville address is 182, 1re Rue Est. This distinction is relevant for an in-person permit-related visit because the municipal service listing identifies Urbanisme separately from the main City Hall address.