Building Permit Authority

Albertville Building Permit Office

Village of Albertville

Active Last verified: 2026-09-27 Saskatchewan
Municipality
Albertville
Jurisdiction
Village of Albertville
Office Hours
Thursday, 9:30 AM-3:30 PM
Address
1 Unity Street East, Albertville, Saskatchewan, S0J 0A0
Google Maps Permit office location

Building permits in Albertville, Quebec, are administered through the municipal inspection service of the MRC de La Matapédia. The Municipality of Albertville retains its own zoning, construction and permit regulations, while the MRC provides the building and environmental inspector responsible for reviewing applications and issuing permits.

Karine-Julie Guénard is the designated inspector for Albertville. Permit inquiries and application arrangements are handled through the MRC office in Amqui rather than a separate full-time building department in Albertville. The municipality’s permit regulations establish a 30-day period for communicating written approval or refusal of an application.

Local Permit Authority

Albertville participates in the MRC de La Matapédia’s shared municipal inspection service. The inspector’s regular office is at 420 Route 132 Ouest in Amqui, while Albertville’s municipal office is at 1058 Rue Principale. The municipality also indicates that the inspector attends its local office one day per week during summer. An appointment should be arranged before visiting.

Permit Process

How to Obtain a Building Permit in Albertville

  1. 1

    Contact the MRC Inspector

    Describe the proposed construction, addition, renovation or land-use change to Albertville’s assigned inspector. The inspector identifies the applicable municipal permit or certificate and the necessary supporting information.

  2. 2

    Prepare the Municipal Application

    Complete the municipality-provided application form and assemble the drawings and property information required under Albertville’s Permit and Certificate By-law No. 03-2004, as amended.

  3. 3

    Submit the Application for Review

    Present the application to the designated inspector. The proposal is assessed against applicable zoning, construction, subdivision and other municipal requirements.

  4. 4

    Receive Authorization Before Starting

    The inspector communicates approval or a reasoned refusal in writing within the regulatory 30-day period. Construction must not begin before the required authorization has been issued.

Application Documents

Building Permit Application Requirements

Section 4.3 of Albertville’s permit by-law specifies a dated and signed municipal application submitted to the inspector in three copies. The required supporting material depends on the proposed work.

  • Municipal application form identifying the applicant or authorized representative.
  • Scaled construction plans, elevations, sections and sketches describing the proposed building or alteration.
  • Information identifying the building’s intended use, location and relationship to the property.
  • Details of parking spaces, access routes, excavation, filling and other site improvements where applicable.
  • A surveyor-prepared certificate of implantation when required under the amended application provisions.
2025 Survey Document Changes

By-law 2025-04, effective August 14, 2025, revised the certificate of implantation requirements. The certificate is optional for specified projects, including alterations that do not change a building’s exterior volume and isolated accessory buildings not exceeding 50 square metres without a poured-concrete foundation. Other listed exceptions also apply. The inspector determines the applicable documentation for each application.

Local Authorizations

Construction Permits, Renovation Certificates and Zoning

Building

Construction and Additions

Albertville requires a construction permit for new buildings, additions, enlargements, structural transformations and excavation associated with a proposed building. Its construction-permit provisions also cover private-road construction and septic installations.

Other Authorizations

Renovations and Property Work

Separate certificates may apply to renovations, demolition, changes of use, signs, landscaping, wells and certain tree-cutting activities. The municipality’s regulations contain exemptions and project-specific conditions.

Albertville’s zoning by-law controls permitted land uses, building placement and development standards. Projects involving a minor variance, subdivision or other planning approval must satisfy the applicable municipal procedures before the inspector can issue the corresponding permit.

For tree removal, Albertville identifies special authorization requirements for environmentally sensitive areas and specified harvesting operations in maple stands or larger forested areas. Ordinary tree planting no longer requires a landscaping certificate following the 2025 regulatory amendment.

Septic Systems

On-Site Sewage Permits and the 2025 Inspection Changes

The MRC’s designated building and environmental inspector also handles Albertville’s municipal authorization process for construction or modification of septic installations.

By-law 2025-04 replaced the former requirement for inspector validation before a septic installation was buried with a photographic documentation and signed compliance-attestation procedure.

Under the amended construction by-law, the person responsible for the work must submit the following documentation no later than 30 days after burial:

  • At least four photographs taken from different angles showing the completed septic absorption field before burial.
  • At least two photographs of the septic tank, including its pre-burial condition and a visible B​​NQ certification number and tank capacity.
  • At least one photograph showing the buried septic installation.
  • A signed declaration of conformity using the prescribed Annex A.
Construction Inspections

Inspection Notices and Permit Holder Responsibilities

Albertville’s permit regulations establish responsibilities for notifying the inspector and maintaining approved documentation during construction. The MRC also requires proposed changes to an authorized project to be approved before the modified work is undertaken.

  • Before starting work:
    The permit holder must give the inspector at least 48 hours’ notice of the intention to commence construction.
  • On-site documentation:
    The issued construction permit must be displayed prominently, and approved plans and specifications must remain available at the construction site.
  • Foundation placement:
    By-law 2025-04 repealed the former requirement for inspector verification of building placement before foundation walls were poured.
  • Completion notice:
    The permit holder must notify the inspector within seven days after completing the construction work.
Permit Fees

How Albertville Building Permit Fees Are Determined

Chapter 6 of Albertville’s Permit and Certificate By-law establishes different fee categories for residential buildings, accessory structures, commercial and industrial projects, agricultural construction, renovations, septic installations and other authorization certificates.

Some charges depend on construction value, floor area or the number of dwelling units. The applicable amount should be confirmed against the municipality’s current regulations before payment.

Official Links

Official Albertville Permit Resources