Building Permit Authority

Annaheim Building Permit Office

Village of Annaheim

Active Last verified: 2026-09-27 Saskatchewan
Municipality
Annaheim
Jurisdiction
Village of Annaheim
Office Hours
Tuesday-Wednesday, 9:00 AM-4:00 PM
Address
522B 2nd Avenue North, Annaheim, Saskatchewan, S0K 0G0
Google Maps Permit office location

Building permits in the Village of Annaheim, Saskatchewan, are administered under the Village’s Building Bylaw No. 11, 2023. The Village is the local permitting authority, while a licensed building official reviews plans and approves applications. Permits may be issued by the Village or its authorized building official.

Annaheim provides its building permit application as Form A within the official Building Bylaw document. Applicants should coordinate submission with the Village office rather than assume an online permit portal is available. The local process also includes zoning compliance, construction-stage notifications and occupancy approval.

Local Permit Note

Annaheim’s Building Bylaw requires at least two sets of plans and specifications with a permit application. The bylaw also requires building official review before a permit is issued. Work cannot begin before permit issuance, and a building cannot be occupied before an occupancy certificate is issued.

Permit Process

How Building Permits Are Obtained in Annaheim

  1. 1

    Confirm the Proposed Development

    Check the property’s zoning and proposed use with the Village before preparing construction plans. Any applicable land-use approval must be addressed separately from building code review.

  2. 2

    Prepare Form A and Supporting Plans

    Complete the Village’s Building Permit Application and assemble the required plans, specifications and site information. Form A is included in Building Bylaw No. 11, 2023.

  3. 3

    Submit for Building Official Review

    Arrange submission through the Village administration. The building official reviews the proposed construction, and the Village or building official issues the permit after applicable requirements and fees are satisfied.

  4. 4

    Complete Inspections and Obtain Occupancy Approval

    Provide the required construction-stage notifications and arrange inspections. Obtain the occupancy certificate before occupying the completed building.

Application Requirements

Annaheim Building Permit Application Checklist

Form A and Section 6 of the Village’s Building Bylaw establish the principal application information and supporting documentation.

  • Completed Village of Annaheim Building Permit Application (Form A).
  • Property identification, including civic address and lot, block and plan information.
  • Owner information, project description and proposed construction type.
  • Building dimensions, lot frontage, number of storeys and estimated construction cost, as applicable.
  • At least two sets of construction plans and specifications.
  • Proposed development site-plan sketch showing existing and proposed improvements.
  • At least two photographs of the building when applying to move a building into the Village.

The site-plan sketch included with Form A requests property dimensions, proposed setbacks, distances between structures and property boundaries, landscaping, fencing, access ways and surface materials.

Land Use and Construction

Zoning Approval vs. Building Permit Approval

Planning & Zoning

Village Land-Use Requirements

Annaheim has a municipal Zoning Bylaw, identified as Bylaw No. 3-2013 and subsequently amended. Zoning determines permissible land uses and development conditions. Bylaw No. 7, 2023, specifically rezoned proposed Lots 8 and 9 in Block 3 to the Commercial District.

Confirm the current zoning designation and any required development authorization with the Village before construction.

Building Code

Building Official Review

The Village’s building official reviews proposed work under Building Bylaw No. 11, 2023, The Construction Codes Act and applicable Saskatchewan construction codes.

The Village bylaw applies to buildings greater than 10 m² in building area, subject to the Act and regulatory exemptions. Smaller projects may still require zoning review, and provincial requirements can apply independently.

Construction Inspections

Inspection Notifications and Occupancy in Annaheim

Section 11 of Annaheim’s Building Bylaw requires owners or authorized representatives to notify the local authority at specified construction stages. Inspection scheduling remains the permit holder’s responsibility.

  • Before construction:
    Notify the local authority of the intended commencement date and provide the required information about the constructor, designer and relevant inspection or review professionals.
  • Excavation and foundation:
    Provide notification when excavation is to begin and when the foundation is to be placed.
  • Superstructure:
    Notify the local authority when a superstructure is to be placed on the foundation.
  • Concealed work and changes:
    Notify the local authority before enclosing work ordered to be inspected and report proposed departures from approved plans.
  • Completion and occupancy:
    Report completion of work and obtain the required occupancy certificate before occupation.

The published bylaw does not establish a universal inspection-booking notice period or identify a public online booking service. Inspection arrangements should be confirmed with the Village and the building official responsible for the permit.

Permit Conditions

Permit Fees and Expiry Rules

Under Section 6(7) of Annaheim’s Building Bylaw, permit costs may combine municipal administration charges, building official plan-review and inspection charges, Saskatchewan Assessment Management Agency fees and any required deposit. The applicable total must be paid before permit issuance.

Section 9 provides that a permit expires on its stated expiry date or, if none is stated, under the bylaw’s default provisions. These include a 24-month period from issuance and an earlier six-month expiry where work has not commenced. Permit holders who need additional time must apply to the issuing local authority for an extension or variation.

Separate Permit Authorities

Plumbing and Private Sewage Permits

Plumbing

Technical Safety Authority of Saskatchewan

Plumbing permits and inspections in Annaheim fall under the Technical Safety Authority of Saskatchewan (TSASK), rather than the Village’s building permit process.

TSASK provides plumbing permit applications for qualified contractors and eligible homeowners. Homeowner permits are restricted to qualifying work on an existing owner-occupied primary residence and do not cover new-home construction.

Private Sewage

Saskatchewan Health Authority

Where a private sewage system is proposed, the applicable permit is administered by public health inspectors under Saskatchewan’s Private Sewage Works Regulations.

Effective November 1, 2026, amended provincial requirements include site evaluation reports and construction drawings for private sewage works applications, along with designer information where certification is required.

Official Links

Official Annaheim Permit Resources

Scroll to Top