Building Permit Authority

Arborfield Building Permit Office

Town of Arborfield / MuniCode Services

Active Last verified: 2026-09-27 Saskatchewan
Municipality
Arborfield
Jurisdiction
Town of Arborfield
Office Hours
Mon-Thu 8:00 AM-4:00 PM; Fri 8:00 AM-3:00 PM
Address
201 Main Street, Arborfield, Saskatchewan, S0E 0A0
Google Maps Permit office location

Building permits within the Town of Arborfield, Saskatchewan, are administered and issued by the Town, with MuniCode Services appointed to provide building plan reviews and inspections. Applications are submitted through the municipal office rather than directly to the inspection contractor.

The Town operates under Building Bylaw No. 2/90, as amended by Bylaw 2018-005, within Saskatchewan’s Construction Codes Act framework. Its published process requires an application, site plan and construction drawings, followed by municipal review and building official approval.

Local Permit Note

The Town of Arborfield and the surrounding Rural Municipality of Arborfield No. 456 share a municipal office at 201 Main Street but maintain separate building bylaws and permit requirements. Properties inside Town limits follow the Town’s application process; properties in the R.M. follow the rural municipality’s requirements.

The shared office is temporarily closed on Mondays and Fridays from April 6, 2026, until January 2027. In-person permit submissions should be planned around the Town’s published Tuesday-to-Thursday office schedule.

Permit Process

How Building Permits Are Processed in Arborfield

  1. 1

    Prepare the Application

    Complete the Town of Arborfield Building Permit Application (Form A), including the proposed work, property identification and construction details.

  2. 2

    Submit the Plans to the Town

    Deliver the completed application, one site plan and two sets of construction drawings to the municipal office. The Town provides downloadable forms but directs completed applications through its office.

  3. 3

    Municipal and Building Official Review

    Municipal administration reviews the submission and forwards it to MuniCode Services. The Town advises that this stage can take up to two weeks, with additional conditions possible following review.

  4. 4

    Permit Issuance and Collection

    The Town contacts the applicant when the approved permit is ready for pickup. One set of submitted plans is returned, and applicable building fees become payable to the municipality.

Application Documents

Arborfield Building Permit Submission Checklist

The Town’s Form A identifies the information and supporting documents needed for an application to be processed.

  • Completed Building Permit Application, signed by the owner or authorized agent.
  • Civic address or work location and legal land description, including lot, block and plan.
  • Owner, designer and contractor information, as applicable.
  • Description of the proposed work and intended building use.
  • Building dimensions, floor area, estimated construction cost and relevant construction details.
  • One site plan showing the proposed building location and property features.
  • Two sets of construction drawings showing the proposed work.
  • Additional project worksheets or technical information where applicable or requested during review.
Site Plan

Property Layout Requirements

The Town’s site-plan template requests building footprints and dimensions, roof overhangs, distances to property lines, driveways, fencing, utility lines, septic tank locations where applicable, and a north arrow.

Project Drawings

Garages and Decks

The Town provides separate attached-garage, detached-garage and deck worksheets. Its deck worksheet requests structural information including joists, beams, columns, foundations, stairs and guardrails.

Permit Coverage

Construction Requiring Building Permit Review

The Town identifies new residential, commercial and industrial buildings exceeding 10 square metres, garages, carports, decks, modular homes, additions, renovations, demolition and building relocation among work requiring permits. Basement development, wood-burning appliances, changes in building use or occupancy, and certain retaining walls are also identified.

Deck height and the nature of the proposed work can affect permit requirements. Confirm the classification of smaller or unusual projects with the Town before construction begins.

Inspections and Fees

Building Official Inspections and Permit Charges

  • Building official:
    MuniCode Services provides plan review, inspection and related building-code services for the Town.
  • Inspection arrangements:
    Confirm required inspection stages and booking arrangements with municipal administration when the permit is issued. Relocated buildings are subject to a relocation inspection.
  • Application administration:
    The Town states that it does not charge an administrative application fee.
  • Building official charges:
    Inspection and review costs depend on factors including construction value, building area and residential or commercial use. Unscheduled inspections may result in additional charges.
Separate Permits

Plumbing and Private Sewage Approvals

Plumbing

TSASK Plumbing Permits

Plumbing permits in Arborfield fall under the Technical Safety Authority of Saskatchewan (TSASK). New installations, alterations and connections to communal waterworks require plumbing permit review separate from the Town’s building permit. TSASK provides online plumbing applications, subject to applicant eligibility.

Private Sewage

On-Site Sewage Systems

Where a private sewage disposal system is proposed, Saskatchewan public health inspectors administer the separate private sewage works permit and inspection requirements. The Town’s building site plan does not replace this approval.

Official Links

Official Arborfield Permit Resources

Scroll to Top